Case Studies

Quick Notes

SHELL 6-WELL GROUNDBIRCH (U.S. Units)

Quick_Notes_Thumb.png

In July 2022 Shell Canada completed a six-well pad in the Montney formation in British Columbia, Canada. Stage Completions Bowhead system was installed in each of the six wells in conjunction with a competitor’s ball-drop system installed in the toe sections.

 

READ MORE

SHELL 6-WELL GROUNDBIRCH (Metric)

Quick_Notes_Thumb.png

In July 2022 Shell Canada completed a six-well pad in the Montney formation in British Columbia, Canada. Stage Completions Bowhead system was installed in each of the six wells in conjunction with a competitor’s ball-drop system installed in the toe sections.

 

READ MORE

SINOPEC SINGLE WELL FRAC (Metric)

Quick_Notes_Thumb.png

In June 2022, Sinopec Daylight Energy Ltd. completed a single well frac in Alberta, Canada in the Montney formation. As single point entry multistage lateral completions have proven to be successful in the area, the Stage Completions Bowhead system was used in this single wellbore.
 

READ MORE

SINOPEC SINGLE WELL FRAC (U.S. Units)

Quick_Notes_Thumb.png

In June 2022, Sinopec Daylight Energy Ltd. completed a single well frac in Alberta, Canada in the Montney formation. As single point entry multistage lateral completions have proven to be successful in the area, the Stage Completions Bowhead system was used in this single wellbore.
 

READ MORE

SINOPEC 3-WELL ELMWORTH MONTNEY PAD (Metric)

Quick_Notes_Thumb.png

In May 2022, Sinopec Daylight Energy Ltd. completed a three-well pad in the Montney formation in Alberta, Canada. As single point entry multistage lateral completions have proven to be successful in the area, the Stage Completions Bowhead system was used in all three wellbores.
 

READ MORE

SINOPEC 2-WELL ELMWORTH MONTNEY PAD (U.S. Units)

Quick_Notes_Thumb.png

In September 2021 Sinopec Daylight Energy Ltd. completed a two-well pad in the Montney formation in Alberta, Canada. As single point entry multistage lateral completions have proven to be successful in the area, the Stage Completions Bowhead system was used in both wellbores.
 

READ MORE

SINOPEC 2-WELL ELMWORTH MONTNEY PAD (Metric)

Quick_Notes_Thumb.png

In September 2021 Sinopec Daylight Energy Ltd. completed a two-well pad in the Montney formation in Alberta, Canada. As single point entry multistage lateral completions have proven to be successful in the area, the Stage Completions Bowhead system was used in both wellbores.
 

READ MORE

MONTNEY TRIAL
(U.S. Units)

Quick_Notes_Thumb.png

In January 2022 an international major completed a six-well pad in the Montney formation in British Columbia. The pad served as a trial to test several single point entry technologies. Stage Completions Bowhead systems were installed in two of the wells in conjunction with a competitor’s cemented ball-drop system.

READ MORE

MONTNEY TRIAL
(Metric)

Quick_Notes_Thumb.png

In January 2022 an international major completed a six-well pad in the Montney formation in British Columbia. The pad served as a trial to test several single point entry technologies. Stage Completions Bowhead systems were installed in two of the wells in conjunction with a competitor’s cemented ball-drop system.

READ MORE

STEWARD SAN ANDRES
(U.S. Units)

Quick_Notes_Thumb.png

In October 2021 Steward Energy completed a well in the San Andres formation in Yoakum County, Texas. The Stage Completions Bowhead system was identified as an innovative and reliable technology and was installed to gain insight on the value of interventionless single point entry in the Permian basin.

READ MORE

STEWARD SAN ANDRES
(Metric)

Quick_Notes_Thumb.png

In October 2021 Steward Energy completed a well in the San Andres formation in Yoakum County, Texas. The Stage Completions Bowhead system was identified as an innovative and reliable technology and was installed to gain insight on the value of interventionless single point entry in the Permian basin.

READ MORE


Case Studies

PERMIAN OPERATOR USES NEW TECHNOLOGY TO REDUCE COMPLETION COSTS

steward-case-study-1.jpg

This game changing technology offers meaningful savings of cost, time, resources, and risk while offering a promising production enhancement. 

READ MORE

1,800+ BOEPD IP IN PERMIAN

case-study-1.jpg

Achieving proper stimulated rock volume (SRV) through innovative downhole completions.

 

READ MORE

117 STAGES

case-study-2.jpg

New single-point entry fracturing record in Eagle Ford Basin, South Texas.

READ MORE

Our World Records Speak for Themselves

  • 14,007

    FEET

    Longest Lateral

  • 113

    BBL/MIN

    Max Flow Rate

  • 220

    STAGES

    Highest Number of Stages

  • 17,884

    FEET

    Deepest Well

  • 10,517

    TOOLS

    Total Tool Runs

Start the Conversation

If you are ready to learn how our interventionless completions can help you reduce risk, lower your carbon emissions, save time and money, while improving performance, we’re ready to start the conversation. Let’s get connected today.